The construction of our new office, Adobe Business Catalyst Service Centre and Webcasting Studio (codenamed 'The Rocket!'), is preparing to launch!
Two years in the planning, the construction of our new offices will be the sixth in our twelve+ year history, and by far the largest, being specifically built in order to meet our demand for growth.
We'll continue to develop high-end online marketing solutions and advanced business systems for our clients; however our new Service Centre will empower us to grow, support and proactively service our clients and Adobe Business Catalyst reseller network and distribution channel partner opportunities.
A few details;
Location: Commercial Avenue, Blueridge Business Park, Dubbo, Australia
Site size: 560m² (6028 ft²)
Internal Walk-in foyer, large open office area, comms room, meeting
Features: room, seperate offices, male & female bathrooms, shower,
kitchen, boardroom/conference/broadcast studio with full
screen projector and opening to entertainment courtyard,
reverse cycle air-con, smart controlled thermostats and natural
ventilation, combination carpet/tile floor panels, energy
efficient & acoustic dampening internal walls & ceiling panels
partly exposed 3.5m ceiling cavities, soundproofed ceiling in
boardroom, bespoke desks & office furniture, 2 person
reception area, space for 6x3 person workstations, opening
windows, floor to ceiling internal glass wall, VOiP POE telecoms,
power & data cabling dropdown via suspended ceiling including
wall mounted 55" LED screens for 'live monitoring' throughout,
game consoles & media server installed for 'breakout' spaces
(Space, light, energy efficiency - and fun! - are core goals in the design of our office)
External Covered walkway pergola, landscaped & established gardens,
Features: office will overlook water garden feature area at front protected
by free standing pre-cast branded panel, IP camera security
Car spaces: 9 (inc. disabled parking access bay and mounted bike rack)
plus off street parking
Staff Capacity: 30 maximum
Bandwidth: 400MB capable ethernet over fibre (direct to Exchange)
Signage: Floodlit illuminated panel at site entrance & roof signage
Opening: 1 May 2012
Latest Timelapse: March 2012 - 4 minutes (front of building)
Stage 5 (@ Apr 2012):
Painting & Tiling


Stage 4 (@ Mar 2012):



Stage 3 (@ Feb 2012):
The front windows are fitted

Walls are going in

Stage 2 (@ Jan 2012):
Area designated for 'Rocket TV'

Floor prepared for cement pour

Roofing installed

Stage 1 (@ Dec 2011):
Internal frame construction starts

40 ton crane (inside the office!) lifts wall panels into position

The rear of the building with my son trying to find a way through the barricade (the site is now closed off for the holidays)


